Calculate how many collectors you need
Enter the accounts and contact work in each bucket to see how many collectors your collections team needs next month.
Collectors needed
The buckets need 45 collectors, the team has 40, so it is 5 short.
FTE by days past due bucket
The plan makes 9,840 right-party contacts a week, and each collector gives 28.0 productive hours a week after shrinkage.
Get the result by email
Set who gets called, how often and in which channel, bucket by bucket, in your lender’s own rules. Start your trial
How collector numbers are calculated
Each bucket’s workload is its contact attempts, with right-party contacts counted at their call length and the rest at the time an attempt with no contact takes. A collector’s productive hours are scheduled hours less shrinkage.
Attempts a week = Accounts × Attempts per account/week Contacts a week = Attempts a week × Right-party contact rate Workload hours a week = (Contacts a week × Minutes per right-party contact + (Attempts a week − Contacts a week) × Minutes per attempt with no contact) ÷ 60 Productive hours = Scheduled hours per week × (1 − Shrinkage) FTE = Workload hours a week ÷ Productive hours Collectors needed = ⌈Σ FTE⌉ Gap = Collectors needed − Team now
The figures above show each bucket’s FTE and the collectors needed.
1 to 30 days past due: (6,000 × 4 + 18,000 × 0.5) ÷ 60 = 550.0 ÷ 28.0 = 19.6 31 to 60 days past due: (2,400 × 7 + 9,600 × 0.5) ÷ 60 = 360.0 ÷ 28.0 = 12.9 61 to 90 days past due: (900 × 9 + 5,100 × 0.5) ÷ 60 = 177.5 ÷ 28.0 = 6.3 Over 90 days past due: (540 × 12 + 4,860 × 0.5) ÷ 60 = 148.5 ÷ 28.0 = 5.3 FTE = 44.1 → Collectors needed = 45
Inbound calls, letters, emails, texts and supervisors are not counted here. The total is rounded up to whole collectors.
Collections staffing calculator
A collections staffing calculator estimates how many collectors are needed from the accounts and contact work in each days past due bucket. It uses contact attempts, right-party contact rate, call length and the time an attempt with no contact takes.
The result shows the workload and the gap between collectors needed and the team today. Use it to plan next month’s team and set contact frequency or which accounts are called in each bucket.
Common questions
How many collectors do I need for collections?
The number depends on the workload in each days past due bucket and the productive hours each collector provides. This calculator adds the bucket FTE and rounds the total up to whole collectors.
How do I calculate collections staffing by bucket?
Work out the workload for each bucket from contact attempts, right-party contacts, call length and the time for attempts with no contact. Divide each bucket’s workload by a collector’s productive hours to get its FTE.
What does FTE mean for a collections team?
FTE expresses a bucket’s workload in relation to the productive hours one collector provides. The calculator uses that figure to show how much of a collector’s time each bucket takes.
How does right-party contact rate affect staffing?
The right-party contact rate affects how many attempts become right-party contacts. The calculator uses the contact rate and call length to work out each bucket’s workload.
What goes into a collections call center FTE calculation?
The calculation uses accounts, contact attempts per account, right-party contact rate, call length and the time an attempt with no contact takes. It also uses scheduled hours and shrinkage to find a collector’s productive hours.